Workspace / Wiki

Saved work, sync and recovery

Know which save status you are relying on.

Saved on this device

Local records and drafts support recovery on the current device. Check project status before closing or moving to another device.

Synced

Synced identifies a durable server acknowledgement. Conflicts and unresolved operations still require review; reloading shared changes should be deliberate.

Review after change

Changing the source drawing or calibration can make quantities stale. Resolve those messages before final export. Universal zero-loss recovery and concurrent-user performance are still under acceptance review.

Use the drawing specifications and reviewed scope inputs. Quantities and suggestions do not constitute engineering approval.

Follow a practical tutorial →

Reviewed October 3, 2026 · Private SheetLink / TakeOffLink product