Systems / Wiki
Girts, openings and selected edges
Keep the physical installation explicit.
Girts
Girts16, Girts24 and Girts32 have Vertical and Horizontal variants. Choose the applicable specification and provide the required geometry. A spacing choice is not an engineering determination.
Fixing runs
Requested fixing runs use maximum 16-inch spacing including endpoints. Initial and final supports, openings and physical run lengths affect the result. Missing engineering inputs must be supplied rather than invented.
Trim and sealant
Specify full perimeter or the selected edges that belong to the scope. Review flashing and window openings independently from the panel cutlist.
Use the drawing specifications and reviewed scope inputs. Quantities and suggestions do not constitute engineering approval.
Reviewed October 3, 2026 · Private SheetLink / TakeOffLink product